
A DLT policy for CASPs should describe how the business uses distributed ledger technology, which operations it controls, who may act and what evidence shows that the agreed controls work. Start with the actual service flows and architecture, then turn each relevant risk into a defined action, an owner and a record.
This guide is for CTOs, CISOs, operations and compliance teams preparing an internal operating document for an EU crypto-asset service provider that uses DLT. The result is a policy linked to working procedures and evidence, rather than a generic description of blockchain.
Define the document and its boundaries
Use “DLT policy” here as a practical name for the document that connects your DLT activities with internal rules. Its scope might cover supported networks, transaction processing, access to infrastructure, third-party dependencies and incident decisions. Include custody or smart-contract arrangements only where your operating model uses them.
Establish those boundaries before drafting. For example, a CASP relying on an external node provider needs to describe how it supervises that dependency and handles an outage; it should not claim to control the underlying public network.
If the service model is still unclear, resolve that first. The distinction between wallet software and services involving control of client assets is addressed separately in our guide to CASP licensing for wallet providers.
Do not confuse this internal document with the EU DLT Pilot Regime, which concerns trading and settlement infrastructure for crypto-assets that qualify as financial instruments.
Connect the policy to the existing document set
For a CASP applicant, MiCA Article 62(2) distinguishes risk controls and business continuity in point (i), technical and non-technical ICT documentation in point (j), and a custody policy in point (m) where that service is intended.
That provides a useful starting point for organising the documents:
| Existing document | What the DLT policy should connect to it |
|---|---|
| Risk management policy | DLT risks, the assessment method, risk ownership and escalation of exceptions. Keep the wider methodology in the risk management policy. |
| ICT and security procedures | Network and system boundaries, access, monitoring, changes and the instructions staff follow. Link the technical architecture to an explanation the responsible business and compliance teams can understand. |
| Business continuity and incident procedures | Decisions during a disruption, permitted fallback arrangements, recovery checks and the evidence needed before normal processing resumes. |
| Custody policy, where applicable | How the DLT activities connect to control of client assets and keys. Keep detailed custody procedures in their designated document. |
The steps and role allocations below are practical recommendations. They are not a complete MiCA ICT documentation checklist or an assessment of compliance with the detailed RTS and DORA requirements. A document called “DLT Policy” should not be presented as a universally required standalone form for every fintech company.
Build the policy in six steps
1. Describe the services and operations
Inputs: the service list, supported assets and networks, product flows and current operating model.
List the operations involving DLT: observing deposits, preparing transfers, signing where applicable, broadcasting transactions and updating internal records. Identify where another team or provider takes over.
Output: a scope statement and a flow diagram showing the systems, handovers and activities covered. Reconcile the description with the company’s business activity plan so that the two documents describe the same service.
2. Map infrastructure and dependencies
Inputs: architecture diagrams, provider agreements, access lists and the inventory of deployed components.
Identify which nodes or remote procedure call (RPC) interfaces the service uses. An RPC interface is the connection through which an application queries or submits instructions to a node. Record who runs each component, who can change its settings and what the business depends on it to do.
Where smart contracts are used, identify their role, deployed version and any upgrade or administrative authority relevant to your service. Where the CASP controls keys, connect access and approval rules to the custody procedures.
Output: a system and dependency register with an owner for each component and a clear boundary between internal and provider responsibilities.
3. Assess the risks in those specific flows
Inputs: the scope, dependency register, existing risk methodology and any available incident or test records.
Consider failures relevant to the model: unavailable or inconsistent network data, unexpected transaction states, compromised access, provider failure, changes to supported networks and, where applicable, key or smart-contract risks.
Output: a DLT risk register. For each entry, record the affected operation, the condition that triggers action, the proposed control and who can accept any remaining risk. Avoid copying generic controls that have no connection to a deployed system.
4. Specify the actions and decisions
Inputs: the risk register, operational procedures and actual capabilities of the team and systems.
Replace “monitor the network” with instructions explaining what staff inspect, which discrepancy they escalate and who decides whether processing continues. Define fallback arrangements only where they have been assessed and can actually be used.
Output: referenced procedures with named functions, approval routes, exception handling and recovery criteria. Choose confirmation rules and recovery targets for the particular service and network; do not copy a universal number from a template.
5. Define the evidence and test the procedure
Inputs: the proposed procedures, monitoring outputs and the controls available for protecting records.
Specify which record demonstrates each action: an approved configuration, access-review record, incident ticket, transaction-status comparison or test report. State who records it and where authorised reviewers can retrieve it. Keep private keys, credentials and unnecessary client data out of policy attachments.
Output: an evidence register and a test report identifying any gap between the written procedure and what the team can execute. A pre-launch exercise should produce clearly labelled test records, not a fictional history of production operations.
6. Approve and maintain the document
Inputs: the draft, cross-referenced procedures, test findings and the company’s approval arrangements.
Assign a policy owner and approver. Record the version, scope, approval date, effective date, open exceptions and the teams that must receive the update. Set review triggers such as a new network, changed custody arrangement, replacement provider, material incident or a test that exposes a missing control.
Output: an approved version with a change log and an accountable owner. An unresolved control gap should remain visible with its owner and treatment decision; approval of the document does not itself fix the gap.
Make DLT security controls traceable
Use a matrix to check whether each policy statement leads to an action that can be demonstrated. These are illustrative entries to adapt to the actual operating model, not a prescribed control catalogue.
| DLT operation | Risk or condition | Action or control | Responsible function | Evidence | Review trigger |
|---|---|---|---|---|---|
| Read network and transaction status through RPC | Provider unavailable or sources disagree | Apply the assessed fallback procedure; escalate if reliable status cannot be established | Infrastructure and operations | Alert, source comparison and incident decision | Provider or network changes; outage exercise fails |
| Submit a client transfer | Outcome of a previous submission is uncertain | Establish the transaction state under the approved reconciliation procedure before deciding how to handle the request | Transaction operations | Request ID, transaction references, reconciliation and approval record | Unresolved or duplicate-processing exception |
| Sign transactions, if the CASP controls keys | Unauthorised use of signing authority | Apply the documented access and approval process and investigate exceptions | Custody and security | Approval trail and access-review record, without secret material | Access, custody model or signing-system change |
| Change a smart-contract integration, if used | Implementation differs from the approved configuration | Assess the change, test it and record approval before deployment | Engineering and security | Version reference, test results and deployment approval | Contract upgrade or changed administrative rights |
AML controls have a different purpose. Link relevant transaction information and escalation points to the AML/CFT procedures rather than reproducing the whole AML framework inside this document. Our AML policy development service describes the separate work on customer risk, screening, monitoring and reporting.
Worked example: an RPC provider stops responding
Hypothetical exercise, not an AMS client case. Assume a CASP uses an external RPC provider to monitor deposits and check outbound transfer status. Its policy permits an assessed alternative source, but only after defined validation. No recovery time or confirmation threshold is assumed here.
- Detect and record. Monitoring raises an alert. Operations opens an incident record with the affected network, services, request references and last reliable observation.
- Establish what is uncertain. The team separates requests not yet submitted from transactions already broadcast whose outcome has not been established. It records the affected deposit and withdrawal queues.
- Make the operating decision. The authorised incident lead decides which activities can continue and which must be held because their state cannot be verified. Operations records the decision and communicates the service impact through the designated channel.
- Validate the alternative. Infrastructure checks the approved alternative against the runbook’s criteria. If those checks fail, the lead records why fallback was rejected and maintains the applicable restrictions.
- Reconcile before resuming. Operations compares affected transaction references and internal records with the validated network observations. It resolves uncertain items under the relevant procedure before releasing the affected queue, rather than assuming that a timeout means a transfer failed.
- Authorise recovery. The designated approver records the checks completed, remaining exceptions and the permitted resumption of processing. Keep the incident timeline, validation results, reconciliation and approval together.
- Improve the document. The review identifies whether the failure exposed a missing dependency, unclear decision authority or an untested fallback. The owner updates the relevant procedure and records whether another exercise is needed.
The exercise is complete when a reviewer can follow the decisions and supporting records from the original alert to recovery. It does not establish that every possible failure has been covered.
Check the document against the operating model
Before approval, select one operation and follow it through the scope statement, architecture, risk register, procedure and evidence register. If one document assigns a decision to operations while another assigns it to security, resolve the conflict and update the affected references.
For an EU authorisation project, AMS Europe’s CASP application support is a relevant next step for discussing how the operating model and supporting documentation fit together. The scope of that support should be agreed for the actual project.
Discuss the documentation for your CASP model
Tell AMS Europe which services and networks you use, where providers are involved and which documents already exist, to discuss the scope of application support.
Frequently asked questions
Who is this DLT policy guide for?
It is for the technical, operations and compliance teams of an EU CASP that uses DLT in its services. Apply the steps to the components and activities the business actually uses. Token issuers, firms using other regulatory routes and operators of DLT market infrastructure need their own scope assessment.
Can a DLT risk management policy replace ICT, AML or custody policies?
Treat it as a connecting document. It can show where DLT risks, decisions and evidence sit, while the detailed ICT, AML/CFT and applicable custody procedures retain their own purposes. Cross-reference the relevant sections and resolve conflicting responsibilities.
How can a pre-launch CASP demonstrate that its procedures work?
Use documented exercises, sample records and configuration tests, clearly identified as pre-launch evidence. Show what was tested, who performed and reviewed it, what failed and what remains unresolved. Do not describe those records as real customer operations.
When should the policy be updated?
Review it when a change affects its assumptions or controls, including a supported network, key-management arrangement, provider, contract integration or incident procedure. Set the review process and any regular schedule through the company’s governance arrangements, and record the outcome.